Liverpool Archive

Friday, 23 July 2010

New Routes and Problems

Earlier this week the Crypt was rest by Rich. There are lots of great problems including the usual colour coded circuits along with a bucket load of extra problems.

As I type this Mark is up the wall resetting 2 lines on the red overhanging lead wall.

Finally Jamie and Ian are paying us a visit on Monday to reset the back wall we will post again once they've been with details of what they set.

AWCC

Recent Stockport Posts